Forum Replies Created

Page 444 of 505
  • Tom Wolsky

    April 26, 2006 at 1:13 am in reply to: prev frame/next frame

    Sorry Captain. I think that only controls the edit trim function for the trim edit window and the [ ] keys. The cursor movement I don’t believe is definable.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 25, 2006 at 11:43 am in reply to: What else is new at NAB

    Apple is showing all three of those cameras working at 24p with FCP. It’s not in 5.1, but it’s probably not far away.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • FCP does not output timecode. The deck generates its own timecode. Start by blacking the beginning of the tape by presetting the timecode to regen begin at 58:00:00. Use the first two minutes for bars abd tone and slate and countdown and whatever and then edit your program onto the tape beginning at 1:00:00:00.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 24, 2006 at 8:42 am in reply to: Final Cut Pro 4 Fit to Window problem

    What view do you want to work with? Do you need the Canvas to be bigger? Stretch it out by dragging between the windows to dynamically resize them.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 23, 2006 at 6:04 am in reply to: Problem Exporting

    Export a QuickTime Movie current settings non-self-contained. Bring that into Compressor and chose the preset that works for you. Avoid any that say two-pass.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 23, 2006 at 1:15 am in reply to: Peculiar problem when adding text to a project.

    Sounds like you were either doing and overwrite with In and Out points in the sequence that were longer than the duration allowed for the title, or you tried to do a superimpose edit and the clip underneath the title exceeded the available duration of the title.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 21, 2006 at 10:23 pm in reply to: replace inconsistent?

    That and the track that’s set as the destination track. Those are the only factors.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 21, 2006 at 9:01 pm in reply to: replace inconsistent?

    The replace edit works by aligning the viewer playhead with the timeline playhead and replacing the frame in the timeline with the frame under the playhead in the viewer. So if in the timeline you’re at the start of the shot and in the viewer you’re near the end of the shot you’ll be the insufficient content error even though the shot in the viewer itself is more than long enough to cover the shot in the timeline. This may be what’s happening to you. It doesn’t have anything to do with performance or the quality of the media.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Tom Wolsky

    April 21, 2006 at 8:15 pm in reply to: Edit to Tape inaccurate?

    It sounds like you need to calibrate the device control on the deck. There are offsets in the device control preferences that let you change that. You should be able to get it consistent a lot closer than 15 frames.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

  • Mark the area that you want to put in the slomo. If it’s one shot it’s easy hit the X key. Put the playhead at the beginning of the shot. Press Cmd-Opt-F to match frame to a new piece of media with the same frame. Mark the In point. Do your speed change and overwrite into the sequence. It takes a lot longer to explain it and write it than it does to do it.

    All the best,

    Tom

    Author: “Final Cut Pro 5 Editing Essentials” and “Final Cut Express 2 Editing Workshop” Class on Demand “Complete Training for FCP5” DVD

Page 444 of 505

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy