i agree with everything said here.
(even the contradictory stuff, nick?)
already pointed out, is that cutting with the existing material will cause MAJOR slow-downs in the online.
but i thought id chime in with a workflow suggestion
“you have to put each set of clips [created by the TC breaks] into a sequence to view the whole tape, and then match frame to start to cut.”
you can load the sequence of clips into the viewer,
then edit them to the timeline by holding APPLE when you make the edit.
if you did a normal F9 or F10 edit, you;d get a “nest” (read up on nests in the manual if you dont know about them yet)
but Apple F9 or Apple F10 will cut the CONTENTS of the laded sequence across.
cheers
nick