Ditto Ron, these sort of questions are a waste of badwidth I’m afraid to say. You can be assured that the HVX200 is already set in concrete, the plastic molding dies are been constructed and the manual written. These sort of changes (CCD and lens) don’t happen in the last few months before shipping. I’m told we will have PAL units here in Australia by September.
Peter Corbett
Powerhouse Productions
Australia