  • Nick Meyers

    June 25, 2007 at 3:25 am in reply to: reveal master clip bug

    you have to work within one project for this to work.

    editing a clip from one project’s browser into another project’s timeline will NOT work.

    nick

  • Nick Meyers

    June 22, 2007 at 9:35 am in reply to: reconnecting media and the ” file

    if you still have the original media, you might be better off using the media manager to copy your whole project over to the other drive.

    nick

  • Nick Meyers

    June 21, 2007 at 12:49 am in reply to: Changing my life to ProRes

    “So this is not a drop frame vs non-drop issue?”

    No!

    drop & non-drop are numbering systems only.

    23.976fps and 24fps are 2 (slightly) different frame rates.

    nick

  • Nick Meyers

    June 20, 2007 at 4:56 am in reply to: final Cut straight to Neg Cut

    most of the answeres you need are to be found in the CINEMA TOOLS MANUAL.

    i also wrote this reply to another query a while back, (it covers a fair bit of ground):

    ===============================

    CINEMA TOOLS.
    i found the manual to be pretty good.
    i printed it out,
    and just ignored the NTSC stuff.
    there’s not much PAL stuff in there, so it’s simple, really.
    i also managed to get my hands on someone else’s footage to use as a test, so i wasn’t going in blind.

    1st question re Cinema Tools: DO YOU NEED IT?
    you only really need cinema tools if you are going to produce a CUT LIST for a neg matcher, or pos conformist
    this is actually quite unlikely.
    When we did Three Dollars, i found most neg matchers didn’t want a Cut List from FCP,
    they wanted an EDL from which they would use their own software to generate a cut list.
    in those days (FCP 4.1.1) FCP couldn’t create a usable EDL from a 24fps sequence, so for us a Cinema Toools Cut List was the only way to go,
    but since FCP 4.5, the 24fps EDLs work.
    as for making a Pos Conform, less and less people will be doing that, but if you are one of the few, then good for you!

    These days you may be scanning your neg for a DI finish.
    this would probably be done with EDLs so again no need for a cut list, & no need for Cinema Tools.
    Of course check with your lab, or tape house about this.

    The next most important thing to ask is ARE YOU WORKING AT 24fps?

    if NO, and if you are shooting and cutting and finishing at 25fps, then you dont need cinema tools, and you dont need to do anything special with your footage at all,
    (other than the Managing of a large project)

    if YES, then you dont necessarily need Cinema Tools either. (unless you need a cut list as stated above)
    You can do the “conforming” directly in FCP.
    “Conforming” is what FCP calls the process of taking you 25fps telecine footage and slowing it down to 24fps.

    a tricky thing to grasp is that while the material runs at 24fps, the TIMECODE still runs at 25fps!
    you have to make sure that the TC rate is set to the special 24@25 setting on your clips and sequnces.
    (this is covered in the manual)

    FCP can keep track of the TC drift by using it’s own special magic, BUT….
    IT WONT WORK WITH SUBCLIPS
    they confuse the calculations.
    SO…
    if you want to cut with slates and takes all broken down,
    then you either have to:
    a) log & capture them like that
    b) capture whole tapes, break them down in FCP and batch export them, (tip: Media Manager probably wont work for this)
    c) use an ALE file from the telecine to create offline clips in FCP that you then batch capture.
    (this last is the most prohibitive for low-budget films as it ups your telecine time)

    basically for the 24@25 trick to work, you need to have one FILE on your drive for each CLIP in your project.
    and if Cinema Tools is part of the equation then you would also have one DATABASE ENTRY for the corresponding FILE and CLIP.

    does that make sense?
    does to me, anyway.

    A BIT MORE ON 24@25

    25fps BATCH LIST BACK-UP
    as stated, once you conform your clips to 24fps, the timecode is screwy.
    now the EDLs cope with this,
    but what if a clip went offline, or you lost a drive or something, and had to re-capture?
    (it;s always good to have a “recovery plan”)
    bad news: last time i looked, you wont be able to use the 24@25 clips in FCP to batch capture
    so make sure you export a BATCH LIST of your clips just before you conform them to 24

    do all the stuff you CAN do to the clips’ column info before you conform, like adding correct scene numbers, or shot descriptions if needed,
    then export the batch list,
    then conform.

    24@25 SETTING IS NON-CRITCAL.
    well you have to have it for the EDL to work,
    but the good news is if you forget to set it, and launch into your edit,
    you can set it retrospectively, and the ELD will still work.

    i know this because it happened on a film i was helping out on (Bitter & Twisted, edited by Simon Wright)
    disclaimer: this was a while ago (V4.5), and i haven’t checked the behaviour recently

    PROJECT MANAGEMENT
    well it;s getting late, so i wont go into too much detail..
    basically what we do is to have separate projects for Assistant type work (log, capture, sync) and Editor type work.
    as far as Assistant Projects go, on WTWTA we had a new project every day for that day’s Lab Rolls.
    Edit projects were organised around groups of scenes.
    that was a pretty huge project all up, and had to be broken down like that.
    Three Dollars and RAMPAGE were not so big, and i was able to keep them contained in just one project.

    The trick there is to keep ALL the RUSHES, plus ONE CUT of the film in the one project.
    keeping the rushes and cut in the same project allows you to match back from the timeline clip to the browser clip.
    any more than one cut will probably bloat the project too much.
    when you’ve finished a pass on the film, and it’s time for the next one,
    either do a “save as” or copy the project to protect that cut and then dive back in.

    ORGANIZING MEDIA
    as i said we captured in a new project every day.
    this puts each day’s captured files in a new folder on the hard drive.
    but once captured, (after all the syncing, etc) we manually move all the FILES to one location, then reconnect.
    i keep them in one folder very close to the top of the drive, not buried folder within folder.
    Makes it easier to see the file path in FCP.

    this is the video media i’m talking about.
    if you’ve got DAT sound or even 2tk files they’d go elsewhere.
    on WTWTA we had multitrack BWF files which stayed in their resppective day’s folder

    IN FCP
    this probably goes without saying, but keep the clips for each scene in a scene bin.
    on Three Dollars i liked to work in Large Icon mode, so i could see the clips.
    RAMPAGE was a doc, with long IV’s so i worked in list mode.
    Eric Zumbrunen the editor of WTWTA, liked list mode with the description column for reference
    this is worth noting:
    as well as having all the clips floating in the bin.
    i REALLY like to have all the clips for a scene laid out in a sequence.
    often this is the best way to review footage and find golden moments.
    it allows you to quickly flick thru your rushes, re-aquanting yourself with the material.
    it also allows for a certain amount of randomness…
    you may start out looking for one shot, and find an even better one!

    allright,
    now it is even later,
    so that’s all for now.

    good luck with your project,
    all the best,
    Nick

  • Nick Meyers

    June 17, 2007 at 5:22 am in reply to: Media Manager worse than ever!

    DM: All of your media has to have timecode in order to be managed. Including hundreds of sound effects and ADR clips. Yeah this is practical.

    NM: yeah, it is.
    if it doesn’t come from tape, FCP is not going to let you delete what may be the only copy of the file in the universe.

    DM: Lots of Media used in filmmaking is non timecode based stuff. Pictures, music, ADR tracks, etc… THIS IS CRUCIAL. WHAT GOOD IS A MEDIA MANAGER THAT CAN’T EFFECTIVELY MANAGE ALL YOUR MEDIA???

    NM: it does manage it.
    just wont trim it.
    don’t see how you can trim a picture, though…

    DM: I don’t have the time to add timecode tracks to the 500 or so small clips…..
    (rant rant rant…)
    NM: all you need to do is give the files a REEL#.
    that would take all of 10 seconds.

    nick

  • Nick Meyers

    June 9, 2007 at 10:36 pm in reply to: FCS 2.0 Problems on Media Reconnect

    it’ll look where the original files were first.

    just direct it to the new location.

    manually if you want
    or there’s even a button in the (white) reconnect window: search next directory.

    “Apologies for the Caps – I’m pasting from another forum. It’s been a long frustrating day.”
    and what excuse did you give to them?? 🙂

    nick

  • another trick that *might* work (this is a real Wild Ass Guess)

    give the ripped clip a reel#
    (i’m assuming it doenst have one)

    then do the export again.

    see how you go,
    nick

  • so do you do 2 installs?

    one for the apps to the default location,
    then another for the media, to a new specified location?

    or can you set it up to do all at once?

  • Nick Meyers

    May 30, 2007 at 7:06 pm in reply to: FCS 2.0 Problems on Media Reconnect

    dont know the answer,
    but cant you just use the copy that DID reconnect???

  • Nick Meyers

    May 23, 2007 at 10:06 pm in reply to: Rename Tool in FCP6

    “And add in there a lack of understanding of 2:3 pulldown!”

    that’d include me! – i’m a PAL-ster.
    but if i had to work with it, i’d at least RTFM 🙂

    nm