Forum Replies Created

Page 6 of 6
  • Ludmil Kazakov

    January 9, 2016 at 5:49 pm in reply to: match frame link error

    i have a bin with transcoded media.. and not all media is in this bin.. when i try to match frame and find the file in bin i get error saying the original file has moved.. i have no idea where the original file is and i cant match back because it says the file moved.. and then when I try to search for it i cant find it.. but i do see it on the timeline…

  • Ludmil Kazakov

    November 19, 2015 at 7:21 pm in reply to: slow and sluggish avid..

    this is stupid.. MC doesn’t handle sequences larger than 25 minutes?? isn’t MC used for editing features? i mean what if we got something close to final version and we want to tweak it, few frames here and there…. wtf.. final cut 7 from last century can handle an entire 90 minute movie no problem…

  • Ludmil Kazakov

    November 18, 2015 at 8:06 pm in reply to: slow and sluggish avid..

    its connected to 64TB Pegasus Thunderbolt drive..

  • absolutely.. we were 2 editors working on mirrored drives.. i can export out of one to external drive.. but not from the other… whyyy

  • ok.. thanks.. i got 2 avid systems.. when i connect external drive to the 2nd edit bay it sees it when i want to transcode.. and when i do it to the main edit it doesn’t.. any ideas?

    i want to transcode it to external drive..

  • Ludmil Kazakov

    November 11, 2015 at 2:21 am in reply to: AMA Conversion Work Flow

    and to add one more thing.. since i am on the subject of bitching about avid.. my friend outputted music file for our promo.. once in avid this file has a metallic sound to it.. i would have to export picture only and add the new sound mix in premiere to get the sound right! WTF!!!

  • Ludmil Kazakov

    November 11, 2015 at 2:18 am in reply to: AMA Conversion Work Flow

    i know.. most footage in avid project is pro res… anyhow.. i did convert the entire 90 minute movie to ProRes MXF and that still takes 3-4 seconds in between actions.. lets say i want to go to trip mode, i get it activated and before i go left or right a frame or two i have to wait.. its beyond ridiculous.. and the computers we use is maxed out mac pro tower.. with 64TB Pegasus Thunderbolt.. still the timeline does not work as smooth as FCP would when everything is converted to ProRes.. either way.. i am happy with avid but the experience is not smoothly. and when i export the red footage is much darker…

    so the question is.. once i covert the entire move.. and i want to add footage… whats the best way to handle it? work off converted footage and mix it in with the new AMA footage??

  • Ludmil Kazakov

    November 10, 2015 at 9:04 pm in reply to: AMA Conversion Work Flow

    its minor changes here and there.. title work here.. change shot there.. come on avid.. final cut 7 can handle that… no need to break timeline

  • yes i see all the original files but in video it says DNxHD 175 X (HD1080p)
    I am following your instructions so i select all the online AMA files along with the offline sequence? then right click relink?

    Media drive – I select the drive where its all..
    and then what should i select for this?
    Load media database(s) –
    relink selected master clips –
    relink only to media from the current project –

    Relink by
    Original
    Timecode is set at start
    Source Name Set at tae name or source file id
    Ignore extension? should it be checked
    Match case when comparing source names? should it be checked?

    and video parameters I have any video format..

  • Ludmil Kazakov

    September 23, 2010 at 4:29 pm in reply to: best export settings?

    well in compressor i use the program stream mpeg settings HD. is that optimal settings for youtube video upload?

Page 6 of 6

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy