Forum Replies Created

Page 87 of 118
  • [Joseph W. Bourke] “I used it, as art director at a broadcast station to manage hundreds of thousands of files – QT movies, AE projects, stills, audio, and on-air elements – on a daily basis.”

    Ditto John Frey – this def deserves an expanded write-up.

    Where was the media kept – SAN, NAS, or moved locally for editing purposes? What were the file formats?

    Alex (DV411)

  • [Alex Udell] “A particular solution called MXF server might have that, but I’m not 100% sure.”

    From the demo I saw, it’s a project-locking mechanism, i.e. only one user can modify it at a time.

    Alex (DV411)

  • Alex Gerulaitis

    July 29, 2011 at 5:32 am in reply to: Raid

    A good controller, high quality drives and the right configuration (e.g. don’t use RAID5 on just three drives, watch your write caching, and don’t play with setup buttons during write operations) – are keys to optimized and well performing arrays. A chassis is important as well, it needs to be of sufficient quality for the application.

    You can come up with RAID arrays for $200 to $200K+ – even for a single Mac Pro. So knowing your criteria and what exactly were the failures will make it easier to come up with recommendations.

    What were the failures – the card, the chassis? What failed, exactly? Was there loss of data? What is the RAID level used? Which Areca card is it exactly?

    Alex (DV411)

  • Alex Gerulaitis

    July 28, 2011 at 2:21 am in reply to: UPS for Sanman 16 bay raid storage

    [Roxanna Turner] ” On the back of the raid, the only info I could see was 450w on the left side and 450w on the right side. Does this mean that a 1000W ups would be sufficient. “

    The power supplies could be redundant (only one operating at a time) which means a 450VA UPS should suffice – but you’d first want to find out the peak power usage of the array from the vendor.

    Usually (but not always): the higher the VA rating of the UPS, the longer the runtimes – so you’d probably want to choose your UPS depending on the nature of the power trips (long? momentary?).

    Or, like Bob Zelin says, just buy the biggest baddest UPS you can afford. 🙂

    Alex (DV411)

  • BMD PCIe (PCI Express) 1x cards can be used in PCIe 16x slots but the photo shows a bunch of PCI (not PCIe) and an AGP slot, none of which is interchangeable. Gotta have a motherboard with PCI Express slots – not PCI, and PCI-X.

    I don’t think this motherboard will work. 🙁

    Alex (DV411)

  • [Joseph Mastantuono] “Why smoke, which I think is built on cuda as well, doesn’t support the 285/470 is a bit baffling.”

    Hardware OpenGL is the name of the game for Smoke and many other Autodesk apps. I don’t believe Cuda architecture is used in those. This is why you don’t see any GeForce cards on their system recommendations.

    Alex (DV411)

  • Alex Gerulaitis

    July 27, 2011 at 8:35 am in reply to: MAMs and DAMs for Premiere Pro

    CatDV offers no collaborative editing AFAIK – but then does anyone else outside Avid Unity and the now defunct FCS?

    Another MAM on the affordable side is Focus Enhancement range of solutions.

    Any idea how these (Focus, CatDV) compare to enterprise class systems like Viz ArDome and IPV? (I can’t be the only one wandering in the dark :))

    Alex (DV411)

  • 2nd that.

    NAB units had two TB connectors (see the video below at 0:53); current product images show one where there used to be two.

    https://www.youtube.com/watch?v=_ftLkBWEo28&feature=player_detailpage#t=53s

    Alex (DV411)

  • Alex Gerulaitis

    July 26, 2011 at 10:27 pm in reply to: MAMs and DAMs for Premiere Pro

    Awesome – thanks Alex.

  • [Kevin Monahan] “I don’t think you can swap out the graphics card in an iMac.”

    2nd that – but the memory upgrade sounds like a plan.

    Alex (DV411)

Page 87 of 118

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy