what if I render the movie, and than cut it at the place where I need to put some extra footage, and then render it again, will I lose some quality ??’cause that was my first idea, fix the whole movie without the piece of film I forgot, render it, and than pasting the forgotten piece of film in.
It’s a bundle of very short sequences all with their own keyframes.
Two movies. With a space difference between them of 1,5 minute. the piece of movie I forgot is about 10 minutes. so I have to move the second movie 10 minutes further on the timeline included all the keyframes..
I’m sorry if I’m asking the same questions again, just want to give a good impression of the ‘situation’..
ps. and I’m sorry if my english is bad.