As with most, I have audio folders and bins, which might have music, sfx, voiceover, mixes and fx folders and bins, which might have shots to pull, motion fx, vfx returns. It all depends on the complexity of the project.
I keep everything organized, much in the structure that the workflow went through to complete the tasks.
This helps especially if an assistant does some of the work, and I have to go back through to see where an issue might have occurred. As a small shop, If I use assistants, its usually for the start of the project to help get things rolling, and then I’m on my own after that.
I would typically have a folder called ‘camera raw’ with bins for each day and a/b camera organized.
If transcoded, then I would have the transcodes in their own folder/bin structure.
Then the clips get the audio sync treatment, which creates a new set of clips.
I usually keep the grouped clips with sync audio in their own bin, just so they are there if I ever need to go back.
I then duplicate those clips and organize them into my “scenes to edit” bins.
Yes, its a lot of folders and bins, which may never be opened again, but they are there if needed.
For features and shorts, I have a folder called “scenes to edit” and a folder called “edited scenes”
In those folders are individual bins for each scene number, or depending on the structure of the show a bin might cover several scenes.
In Scenes to edit, I leave it in film strip mode, with the shots laid out in a grid. top to bottom are the shot numbers,
(sc1, Sc 1A, Sc 1B etc) left to right are the takes, so each clip has been renamed to Sc1 Tk1, SC1 Tk2 etc. I usually make sure the thumbnail is an accurate representation of the shot itself, rather than just the first frame, which may be a slate, or a boom operator standing by.
As a scene is cut it is placed in the cooresponding “edited scenes” bin, and then later used as a source for the assembly process. The assembled edits are ofcourse placed in their own bin.
As a guy who also does colour work on projects done by other editors, I really appreciate getting a project from someone with a high level of organization. Just makes it so much easier to figure out where stuff came from if something goes off the rails. I have had to call up editors and ask which version was the final version because the naming was all over the place, and there were layers upon layers of video that were covering other shots, and I wasn’t sure if this was the locked sequence or not. (clean it up if you are sending out of house at some point). Don’t make me relink to 5 layers of video if only 1 is needed in the final version.
It also helps me if I have to come back to something months later. I’m not looking at the project saying “what the hell was I doing here?”
Glenn