Forum Replies Created

  • I believe my problem was due to the use of a variable frame rate (VFR by the affected clips. After using HandBrake to convert the files to constant frame rate (CFR), my issue was resolved.

  • I’m having the same problem: 29.97 fps is importing as 14.985 (14.99) fps. I need the clips to come in correctly because I’m trying to do a Replace Footage action on a 50m documentary with 40+ minutes of interviews… The new clips have cleaned up audio from Audition, and I need to replace all the instances of edited a/v simultaneously to save me hours of piecework. Thoughts?

  • Joe Weber

    March 2, 2015 at 8:07 pm in reply to: PP CC Imports fottage at half frame rate

    There is definitely something wrong. I am having the same problem: A clip which is actually 29.97 fps (verified using QT properties) is importing as 1/2 framerate, or 14.985 (rounded up to 14.99) fps. This happens with several of my clips, regardless of the import method used (drag/drop from OS, right-click/import, or use Media Browser). I cannot interpret the footage back to 29.97, as doing so doubles the speed of the audio (an interview), making it unusable.

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy