Not sure i totally understand the problem here either. You have say 100 sequences, each with 1 video track. Lets say that track is called V2.
You want to cut those sequences, or part of those sequences into a new timeline that will also have only 1 video track, which you would like to have default to V2. You do not however want to take the enormous amount of time to hit a hotkey for new sequence followed by a hit key for create video track. (Say 3 seconds of wasted time per sequence…at 100 sequences…thats almost 5 minutes!
Yes you would then have to go and delete V1 off of each of these sequences. Lets say that takes another 5 minutes!
First question I would ask…if the sequence only has 1 video track, does it matter what it is label as? Im assuming you will still be using this sequence as a source at some point.
Solution 1:
Have you tried cutting everything onto V1 and then done a select everything command and simply moved the entire timeline up 1 track. I would think this would auto create a v2 track.
Yes you would still have to delete that pesky V1track…5 mins down the drain!
Solution 2:
In your settings tell Avid to automatically create all new sequences with 2 video tracks. This would save you the tedious 3 second task of having to create a new video track each time. Yes you still have to delete that darn V1…what is with V1? Its like it is just trying to drive you crazy!
Solution 3:
Create a macro to automate these keystrokes of creating a video track, and deleting V1….all with the push of 1 button. I know…I know…the pushing if that button does eat up valuable time. Lets say 1.5 seconds…Hey…i just saved 2.5 mins for every 100 sequences you have to do!
Glenn
(edited to fix bad thumb typos)