We have already cut most of the project which is on a 29.97 timeline with mixed frame rate footage on the timeline.
I’m not concerned with the P2 footage because it’s already 23.98.
I’m worried about the other footage and losing the in’s and out’s when we go to a 23.98 timeline.
Hopefully that’s a bit clearer.
Thanks.