-
Switching Frame Rates midway through timeline (23.976 –> 29.97) [NOT an ‘interpreting’ issue]
Hey guys this probably isn’t what you think!
I work with converting/interpreting different footage frame rates all the time. Not the issue here.
Basically I have a project where a kid comes home from school to set the stage. Then he starts playing his video game, at which point the video dives into ‘the video game world’. The part where the kid is coming home, I want it to have a film look, so it’s 23.976. Then, for the video game i was wanting a TV look (read: 29.97fps), however I’m unfamiliar with a way of combining the two for the final output, without making the first ‘filmic’ 23.976 scenes look bad by forcing them into a 29.97 timeline.. It’s probably a stretch, but is there some way of like switching frame rates midway through? haha
Thanks for any advice!