-
Problems converting 29.97 timeline to 23.98
I am having problems converting a 29.97 timeline to 23.98.
Here’s the rundown:
The project was shot with the DVX-100A in 24 P Advanced mode.
The editor captured and edited the footage at 29.97 (argh!).
Now the motion looks off since the pulldown was not removed when capturing.I understand I can remove the pulldown by recapturing with Advanced Pulldown Removal or using Reverse Telecine, but what about the differences in the timelines? When I copy the 29.97 timeline into a 23.98 timeline there are 1-2 frame gaps between many of the cuts…
Thanks,
Mark