-
Premiere Pro Mismatch – Export is 3 Secs Longer Than Sequence Duration
Hello everyone,
I have an issue here with PP CC 2015 – or maybe I do not understand frame rates / time codes correctly.
Here’s the PP project info:
> PP sequence setup is 23.976p
> all footage used in the sequence was shot at 23.976p
> timeline in the sequence shows a total duration of 00.39.59.19
> when I export the video as 23.976p, it then shows a duration of 40 mins 2 secs in MediaInfo – a full 3 secs difference
> VLC player shows a duration of 40 mins 2 secs as well when playing the file yet the time code that was burned into the exported file shows 0.39.59.19 on last frame…… (?)When I import that PP video file into Pro Tools into a 23.976p timeline it shows a duration of 0.39.59.19, but when I click on video properties I see 40 mins 2 secs 19 frames…
What am I not understanding here ? Shouldn’t these SMPTE timcode values refer to the actual length of the sequence depending on the frame rate setting ?
Why does the total duration of my export differ from what was stated in the sequence timecode ?
Thanks !