-
How to calculate the usage of specific footage on timline?
Hello I’m editing a project.
I got footage that I can use but I need to pay for it.Is there a way to mark a directory or selected clips in the project and find out how much time they got on a specific timeline?
that way I calculate automatically how much raw footage I actually used.
And it will same me a great amount of time – instead of timing it out myself.
there is gotta be a way right?
٩(̾●̮̮̃̾•̃̾)۶
ADOBE MASTER COLLECTION CS4
Win Vista Ultimate 64bit
RAM: 8GB (Corsair 800Mhz)
CPU: Intel Quad Core 2.4Ghz (Q6600)
GPU: ATI x1950XT 256MB
MB: Asus P5K Deluxe WiFi-AP