-
FCP framerates problem!!
Hello,
I THOUGHT I created a sequence at 59.94 fps because the majority of my footage is at 59.94.
After editing quite a bit of it (project needs to be completed by tomorrow). I noticed a couple of the clips stuttered and realized that somehow the sequence got changed to 23.98. I need to get all these clips back into a 59.94 sequence.
Is there an easy to do this without copying and pasting one clip at a time? (if i copy the entire sequence from the 23.98 sequence and paste it into the 59.94 sequence everything gets out of sync.)
Please help!