-
Estimated render time – silly
This is something that I’ve always found humorous. I just rendered a 5 minute timeline which took about 3 minutes. However, the ‘Estimated Time Left’ ticker stayed at 39 – 45 seconds for the entire render. This has always been the case for as long as I’ve used Premiere.
If the algorithms are that bad, why not just do away with the ticker altogether, instead of giving us false hope?
Asus P6X58D Premium * Core i7 950 * 24GB RAM * nVidia Quadro 4000 * Windows 7 Premium 64bit * System Drive – WD Caviar Black 500GB * 2nd Drive(Pagefile, Previews) – WD Velociraptor 10K drive 600GB * Media Drive – 2TB RAID5 (4 – WD Caviar Black 500GB drive) * Matrox MX02 Mini * Creative Cloud
——————————————-
“98% of all computer issues can be solved by simply pressing ‘F1’.”
Steve Brame
creative illusions Productions