-
Copy bin or matte-linked files between projects
Hi,
I have a long form project split into reels, with a lot of VFX shots with mattes already linked in one reel. Is there a way to copy this bin or the vfx files (with linked mattes) so that I don’t need to manually re-link the mattes again in each reel?
It would be great if there was a way to copy Bins/Matte linked files between projects for future projects too.
I appreciate the vfx should have been delivered in reels and only the vfx for each reel loaded into each respective project but sadly thats not the case so just seeing if there’s an easy workaround (-;
Thanks!
Toby