Change duration of many clips in timeline at once?
Using PPro 2.0…
I have a timeline with a lot of clips (JPEG stills) that are all 5 seconds each. I want to change the duration of them all to a different length. Is there an easy way to do this?
Is there even just a way to change the duration and have the rest of the timeline ripple-adjust to make room for the added duration?
I could deal (worsr case) with having to select each clip, selecting speed/duration, and changing it, as long as the timeline adjusts. If I have to push every clip over to make room for the added duration, that adds a lot of work.
If there was a way to select ALL the clips and do it at once, that would be even better.
Thanks.