-
A better work flow?
I have a FCPX project, which was a rework of some 16 mm silent film. It was edited in the primary story line and has Foley and voice overs as collected clips. Now I have an improved digital transfer of the 16 mm film and want to replace the original without disrupting the timing of the audio. The two digital transfers are not identical in speed, but within a percent or so.
I built a new version by putting the new film in the secondary story line, cutting and trying to match action down to the frame level. I could turn the upper segments on and off to see how they matched. A little tedious, but it worked. However, now it would be convenient to have the new clips in the primary story line for further editing, but since the audio is synched to the existing material, is there a good way to do that?