-
29.97 convertion to 23.98
Hello,
I have a problem with my new 23.98 timeline that I created after converting all my footage to 23.98 from 29.97. Let me explain: I shot the movie on film and telecine it onto DVCAM. I edited the movie on a 29.97 frame rate (yes, I did not do the pulldown like I was suppose to do in the beginning). I converted all my files to 23.98 through cinema tools and copied my timeline to a 23.98 timeline, though, now I have missed frames (black holes in the timeline) my effects such as speed and reversed footage came in as the wrong footage and I actually have frames that are completely gone. I’m checking everything against my old 29.97 timeline.Is there a different way to convert all my media so I won’t have these problems? If not how can I import the media to a 23.98 timeline differently? Is there a way to just take the 29.97 frames EDLs and convert them to 23.98 EDLs? Please help and thank you in advance.