Creative Communities of the World Forums

The peer to peer support community for media production professionals.

Activity Forums Apple Final Cut Pro Legacy Problems converting 29.97 timeline to 23.98

  • Problems converting 29.97 timeline to 23.98

    Posted by Markryan on September 5, 2005 at 9:18 pm

    I am having problems converting a 29.97 timeline to 23.98.

    Here’s the rundown:
    The project was shot with the DVX-100A in 24 P Advanced mode.
    The editor captured and edited the footage at 29.97 (argh!).
    Now the motion looks off since the pulldown was not removed when capturing.

    I understand I can remove the pulldown by recapturing with Advanced Pulldown Removal or using Reverse Telecine, but what about the differences in the timelines? When I copy the 29.97 timeline into a 23.98 timeline there are 1-2 frame gaps between many of the cuts…

    Thanks,
    Mark

    Jerry Hofmann replied 21 years ago 2 Members · 1 Reply
  • 1 Reply
  • Jerry Hofmann

    September 6, 2005 at 2:01 pm

    Whatever you are seeing in the 29.97 playback is most likely not due to capturing 24PA material as 29.97… (rather it’s something else) The only thing you’d gain by removing the pulldown is smaller files I’d think. The look of the motion should be the same.

    That said, you’ll have to remove the pulldown in the source clips with Cinema tools or recapture it from tape removing the advanced pulldown pattern to work in a 23.98 sequence setting in any event. Can’t just put the 29.97 material in a 23.98 sequence…

    Jerry

    Apple Certified Trainer

    Author: “Jerry Hofmann on Final Cut Pro 4” Click here

    Dual 2 gig G5, AJA Kona SD, AJA Kona 2, Huge Systems Array UL3D

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy