-
Workflow Question
What if you have long (20min.) green screened files, cut and spread across a prores(proxy) timeline (90min), and you need to get just those pieces (subclips with 1 second handles) to your effects editor who will be dealing with the R10k RGB 10 bit (2K 4444?) original files. All while retaining proper clip lengths for our on-line reconnect.
The 2 files are separate. Compressed from the 10bit to ProRes(proxy).The filenames are the same. I had assumed that we would always retain clip length, and the entirety would be Keyed. Keep the file-name, keep the clip-length, all is well, right?
I thought perhaps the media manager would be able to export the clips somehow, from the uncompressed footage, and then I could proxy his return and reconnect into the timeline. Then we would have all of those files to reconnect to in the final on-line output (something like 80-100 pieces, as opposed to 5).
The solution to me is obvious, Key the entire clips and keep the reconnects.
Please if you have any ideas I’d love to hear them.
Thanks
-Rob