-
Workflow FCP7 and CS4
I need to start a workfow between FCP7 and Premiere CS4 for 4 hours of footage shot with the Panasonic AF100 as 1080p25. The two editing systems are in different countries but both parties have the raw footage.
My editing partner has already done a cut using CS4 and I asked for the compressed files so I can continue on the same edit. He sent me the compressed files as H.264 @ 30fps. I’m starting fresh on this cut but I set my sequence as Prores422 LT 25p to match the settings of the shot footage. When I import the files the sequence wants to match the files setting. If I say no it takes forever to render.How can I fix this?
I was looking also at doing a Log and Transfer of the entire footage in FCP and sharing it with him online but the files are too big to share. Even as DV they are still too large.
Even if we need to start on the edit again I am fine with it as long as we can setup both our systems to work efficiently. Can you please suggest the best way to work in parallel. As I said, we both have the raw files.
I would appreciate your support!