Creative Communities of the World Forums

The peer to peer support community for media production professionals.

Activity Forums DaVinci Resolve very lengthy save time. ..

  • very lengthy save time. ..

    Posted by Ronen Pestes on March 8, 2013 at 7:35 pm

    I am on Davinci light with an episodic 20 min with 3 acts.
    OS 10.8.2 Mid2010 MacPro with 32GB Ram and GT8800 for display and Q4000.

    I have a up to 3-4 minutes save cycles which is extremely slow and time consuming.
    Is that considered normal? How can I make those save cycles go faster?

    I have about 900 cuts per show, are the still store takes long time to save?

    Thanks,

    Ronen Pestes
    Film Editor
    http://www.ronenpestes.com

    Saul Budd replied 13 years ago 6 Members · 15 Replies
  • 15 Replies
  • Eric Johnson

    March 9, 2013 at 12:48 am

    I recently did a full show in a single project, @ 500 shots, and it took WAY longer to save then one act per project. There’s a bit more front end, getting your gallery set up and what not, but while working it’s much better… I’m not planning on doing a full show in one project again…

  • Ronen Pestes

    March 9, 2013 at 3:40 am

    Are you using the light version?

    I don’t think a project per reel is a productive workflow.
    What do you do on a feature? to much prep work and checking when resolve do it all for you in one project, but that doesn’t work as fast or well if you need to move grades from project to project especially with tape-less media.

    I am going to test it on another setup and see if its any better.

  • Eric Johnson

    March 9, 2013 at 4:29 am

    Full version.

    A reel per project, though slower has served me well in the past coming from Apple Color where the rule of thumb was 20 min’s or 300 cuts… when I moved to v8, it was suggested I follow the same protocol, which worked fine.

    Since v9 was introduced, and while v8 was current, I read many discussions on this forum discussing the pro’s/con’s of both workflows… And there are mixed thoughts and different places that the time is spent…

    So, I finally did a show all in one project. An hour long doc for broadcast, not nearly as cutty as some stuff I’ve worked on, but was near 600 edits…. The project was easier in the sense of tracking corrections but took nearly twice as long to save…

    All I can say is that that is my experience.

  • Margus Voll

    March 9, 2013 at 9:56 am

    I just did feature last week and it had tons on media an 1300 shots 2 hours 15 minutes.

    Yes it took some time to save but we knew it before hand and it did not bother much.

    This project was preset before me and it could have been cut down to smaller reels but i did not want to
    change the workflow as it turned out later resolve was also sort of on-lining facility 😉

    This week i have another feature at hand. Its about 1,5 hours.

    At first i had 5 reels as edls. They connected nicely and gathered all media pool with material.
    I noticed that slowing down came when i made one long timeline out of all the edls
    but did not compare save times if different shorter timelines would help in save times.

    I think you have to consider if you loose time in saving or loose time popping from project to project.
    If your machine can handle it and workflow demands it then long project could also be good option.
    I have a lot similar stuff in the movie and it is good to jump a round a timeline.

    Maybe not the best practice but serves me good with this feature at hand.

    So one may want to calculate different parameters where saving speed is just one of them.

    Margus

    https://iconstudios.eu
    https://vimeo.com/iconstudioseu/videos

    DaVinci 9, OSX 10.7.4
    MacPro 5.1 2×2,93 24GB
    GTX 470 / Quadro 4000
    Multibridge 2 Pro

  • Michaelmaier

    March 9, 2013 at 11:11 am

    [Margus Voll] “This project was preset before me and it could have been cut down to smaller reels but i did not want to
    change the workflow as it turned out later resolve was also sort of on-lining facility ;)”

    So you onlined in Resolve? Please do tell. 🙂
    I would love to know your workflow for that.

    Thanks.

  • Margus Voll

    March 9, 2013 at 1:49 pm

    Actually you would not want to do that and use NLE for that etc.

    This was just one time and i do not consider it effective of doing things.

    It was started as so and i had to finish it just that way.

    Added some footage, did some sync edits etc.

    But it would be so much faster to do in nle or smoke etc.

    SO pleas do not consider it as viable workflow.

    Margus

    https://iconstudios.eu
    https://vimeo.com/iconstudioseu/videos

    DaVinci 9, OSX 10.7.4
    MacPro 5.1 2×2,93 24GB
    GTX 470 / Quadro 4000
    Multibridge 2 Pro

  • Michaelmaier

    March 9, 2013 at 3:12 pm

    I see.

    Smoke, sure. But compared to a NLE, Resolve just seems to have so many more appropriated tools for finishing. High end grading, denoise, scale, sharpening,reframing,stabilization, cosmetic touch ups, smoothing out skin blemishes, power windows etc all at the touch of a button. Most NLEs can’t even come close. This is why Resolve looks so tempting.

    If you have Smoke this is no longer a question of course.

  • Margus Voll

    March 9, 2013 at 10:23 pm

    What i do i grade in Resolve but fx and stuff like that do in AF afterwards or before hand.

    Margus

    https://iconstudios.eu
    https://vimeo.com/iconstudioseu/videos

    DaVinci 9, OSX 10.7.4
    MacPro 5.1 2×2,93 24GB
    GTX 470 / Quadro 4000
    Multibridge 2 Pro

  • Jake Blackstone

    March 12, 2013 at 4:22 am

    Look into Baselight Editions. It does pretty much all you had mentioned and does it very well I may add.

  • Ronen Pestes

    March 12, 2013 at 4:29 am

    Thank you guys,

    but my question was about length of save time in resolve and how to make it faster, not which system better in finishing and output –
    should I change the post name to ‘The reason we are NOT buying a full DaVinci control surface is…’ to get response to this question…
    ?

    🙂

    Any way I think save time is more connected to the amount of still in the still store rather length of sequence.
    In my case, 20 minutes 3 act show with 900 edits (repeating shots between acts) creating a project per act is not something that make sense from grade management. So making save time shorter, especially in supervised session with client is a key. (and much needed improvement for Mac based systems)

    Ronen

Page 1 of 2

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy