    Posted by Anhtu Vu on October 20, 2012 at 5:11 am

    I’m getting files (DPX sequence) extracted from DCP in 2048 x 858, true 24p and discrete 5.1 surround. I need to downnres and conform these to 1920 x 1080, 23.976. What’s the best approach via AE cs6 ??

    would this work ?

    1- Import DPX sequence in AE and make sure ”interpret footage” sees it as 24p (for some reasons the few tests i did, AE sees these DPX sequence as 30, i had to change it manually)

    2- now this is the part i’m that i’m unsure, do i simply drop this DPX sequence on a comp with resolution set to 1920 x 1080 and frame rate set to 23.976 ??? How about pull up / down settings ???

    As for the audio, i will do it seperately in Protools as all these video apps simply mess up the audio.

    Thanks

    Walter Soyka replied 13 years, 6 months ago 3 Members · 5 Replies
  • 5 Replies
  • Vishesh Arora

    October 20, 2012 at 9:45 am

    Anhtu

    Go to Edit> Preferences > Import and change the default Sequences Footage Frame Rate as required.

    Vishesh Arora
    3D and Motion Graphics Artist
    Films Rajendra

    Blog:
    https://digieffects.wordpress.com

    Demo Reel(3D):
    https://www.youtube.com/watch?v=lHPgIJU_BR8

  • Anhtu Vu

    October 21, 2012 at 6:38 pm

    @Dave

    I’m not sure if you’ve read my entire thread as i’m aware of the audio problem and mentiomned that i will conform in Protools. All these video apps (After Effects, Cinema tools, Premiere, FCP….) can’t properly conform audio.

    Anyways, regarding your suggestion, why would you want to interpret the DPX sequence as 23.976 since it is true 24. Isn’t the proper way is to interpret as 24p then drop it in a 23.976 comp ??? thx

  • Anhtu Vu

    October 21, 2012 at 9:46 pm

    Thanks Dave….I have a few more questions:

    1- So what you’re saying is AE conforms differently when you do it in the interpretation stage or comp stage or render stage ???

    2- I tried your way by interpreting a true 24p clip as 23.976 then put it in a 23.276 comp then render out as 23.976

    or

    Interpret as original 24p, put it in a 24 p comp then render out as 23.976..

    End result looked exactly the same!

  • Anhtu Vu

    October 22, 2012 at 11:57 pm

    once the comp is in the queue, there’s a box where you can change the frame rate..and that’s where i changed it to 23.976 and as i said the end result looked the same as if i was to change the frame rate at the interpret stage as suggested.

  • Walter Soyka

    October 23, 2012 at 5:05 am

    A similar issue was covered recently in another thread about 24.0 vs 23.976 fps [link].

    [Anhtu Vu] “once the comp is in the queue, there’s a box where you can change the frame rate..and that’s where i changed it to 23.976 and as i said the end result looked the same as if i was to change the frame rate at the interpret stage as suggested.”

    This is not the right way to do it. Consider what’s happening — you have a source footage item that has 24.0 frames every second, and you are sampling it at 23.976 frames per second for render. You are not changing the duration, which means you have to squeeze 24000 frames on the source side (over 1000 seconds) into 23796 frames on the output side. To do this, you must skip 24 frames every 24,000, or one frame per thousand.

    By interpreting the footage at 23.976 fps, you preserve all your original frames, but alter the total duration slightly.

    Walter Soyka
    Principal & Designer at Keen Live
    Motion Graphics, Widescreen Events, Presentation Design, and Consulting
    RenderBreak Blog – What I’m thinking when my workstation’s thinking
    Creative Cow Forum Host: Live & Stage Events

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy