-
Tacking Issues
Alright, so I am dealing with a project where I have some great footage that is already sped up in some areas, making a total tracking nightmare. Basically, the frame rate at which the footage I am using plays back is already locked in, as it has already been exported from FCP, so I cannot simply change the speed at which it plays back and track at a normal speed.
More specifically, there are spots within the footage, where the playback speed is normal and then it ramps up towards then end. This is where my track gets way out of control.
I realize that in an ideal situation, I would track to the footage at a normal speed and they change the percentage at which it plays back after the fact, but I would appreciate it if anyone has any tips that would help me out with the situation that I am in.