-
Swapping PIP tracks?
I’ve got a project I’m working on which has two video/audio tracks where I edit in a Picture in Picture segment here and there throughout. I have no problem with that and I’ve done several videos like this. My problem comes in this new project where I try to swap the PIP frames, iow, what starts out as the main full screen I want to become the smaller PIP frame. It’s not letting me do this. I’ve tried inserting a third video and audio track, splitting the video and moving the tracks to the newc track but that isn’t doing it either.
Has anyone done this, switched the PIP frames?
I hope I’ve explained it properly. I’m running movie studio platinum 11.0 with the recent 293 build.
I’m away from home now but thought of something I haven’t tried, swapping the video tracks from top to bottom. Iow, is there a requirement that the full screen video needs to be “above” the PIP video track?
Any suggestions? I do love this software, everything I’ve thought of I’ve been able to do with about five mins of searching, except this one.
Thanks!!!!
Bill