-
Replace Footage with subclip or sequence possible ?
I have a project which I edited with a low res file then got the hi res file from the client. The low res was an excerpt from the original clip so longer duration and different start point. This is ex HDV and there is no time code reference on the clips.
I know how to replace a clip with another clip but in this case I need to either make a subclip of the hires and then replace the low res clip with that or make a sequence to length then replace the low res clip with the sequence but I can’t see that option. When replacing clips there is only the option to replace with another source file nit from within Premiere.
The only solution I can see is the export the hires to length then reimport as a clip but this seems a bit cumbersome with the potential to loose quality in the process.
Cheers
Andy