    I have two master clips in my bin. One of them has been imported wrong and has two small black bars on each side. That master clip has been used in a sequence. Is there a way to unlink the video of that master clip and relink it to another media file that I have of the same footage imported correctly?

    I know I can just match frame my way out of it and replace the clips but it’s pretty time consuming and I would just like to know if there’s a way.

    I don’t have the original media files anymore but when I did I tried to batch import that footage but for some reason it would always import with the black bars and that didn’t happen when I did a clean import.

    Thanks in advance.

    Adam

    Tina Hedegaard replied 13 years, 1 month ago 3 Members · 3 Replies
  • 3 Replies
  • Scott Cole

    February 26, 2013 at 10:59 pm

    I know we do something akin to relinking master clips to a different media file in our color correction process. Here’s what I would try. First consolidate the offending clip to another media drive, selecting “Delete Original” when doing the consolidate. Unlink the offending master clip from its media file. To do this hold both ctrl and shift while rightclicking the master clip; UNLINK CLIP will appear in the context menu. Once the media is offline, you can start the relink by righclicking on the master clip without using ctrl and shift. RELINK will appear where UNLINK had been. Your media drives will appear as a pulldown menu, so select the drive where you feel the good clip lives, also uncheck “current project only.” Assuming the good and bad clips were of identical duration and had matching metadata, the masterclip that was used in your edits should relink to the good media.

    M. Scott Cole
    Senior Post Production Editor
    60 MINUTES
    CBS News, NYC
    sc6@cbsnews.com
    mscottc@comcast.net

  • Adam Paez

    March 3, 2013 at 12:23 am

    The clips are both imported from the same source file. An avi in the DV format I believe. But for some reason they both have different time codes and one master clip is one frame longer than the other. Moreover the one I want to relink to doesn’t have a Tape name like the offending clips does. Tried giving the offending clip a new source by unlinking and making them the same but couldn’t make it relink.

    Will just manually replace clips on the timeline.

    Thanks.

  • Tina Hedegaard

    March 24, 2013 at 1:22 pm

    Normalt you Can batch import the clip and the sequence World update

    Thanks

    Tina Hedegaard
    Editor | Assisting Editor
    Final Cut Pro 7 | Media Composer 5.5.3/6.0.3 | Adobe Premiere Pro CS6