-
Rearrange comps and save them
OK so this is going to a “d’uH moment” when I get the answer, or maybe I’m just working too long on this project…
I am cleaning up a project and re-arranging comps in the timeline by dragging them. I can not convince AE7 to save them in that order – when I save and re-open the project, they comps are back in the previous order (alphabetic order.)
Even if I “save as” with a different file name, the new project opens with the original order.
I think I had this work the desired way before. Other than renaming the comps with a “01,” “02,” etc, is there a way to have the project open with the comps in the order I need?
Sorry, there were no replies found.