-
re-rendering times?
I have 150 GB avi file (for VDub) that I brought back to a new Vegas project. I have deleted few minutes of the project using two cuts and one cross fade transition with no other edit. Original file took 17 hrs to render. the new file shows me around 4.5 hrs (it estimated 18 hrs until I’ve switched from Best to Good rendering setting – tx to John R. for a recent tip)
I was under the impression that Vegas only renders the changes, not the whole file again)so why such a long render time (equal to original using Best setting or not much shorter relatively after switching to Good)?
Andrew