-
Photoshop slates have wrong vid rate
I’m building identical NTSC and PAL sequences, and have just come to the PAL part of the project. There are about 60 clips with slates prior to each clip. I’ve built the slates separately in Photoshop for NTSC dimensions as well as PAL dimensions, but when I add a PAL slate to my sequence, I get the following error:
Operation not allowed. You cannot nest sequences with different editing timebases.
The vid rate on the PAL-sized Photoshop files is 29.97 while my sequence will be 25. Anyone know how to change the vid rate of a Photoshop file, or have a workaround so I can keep working on this?
FCP HD
Dual 2.5G / 10.3.9
PS 7.0Thanks,
Amy