-
mixed frame rate timeline?
When editing mixed 23.98 footage into a 29.97 timeline, what is the process? Will FCP add in the proper pull-down to those 23.98 clips and leave the 29.97 material alone? Or should you simply edit using the mixed timeline and once you have picture lock, properly convert the 23.98 clips to 29.97 with 2:3:3:2 pulldown using AE or Compressor?
Same question for speed changes. Which I posted on about 2 weeks ago. Can or should you edit using FCP speed changes for picture lock, then export those clips to Compressor or Motion for the optical flow retiming and replace in a new timeline?
OS 10.5.5, Mac Pro 2 x 3 ghz quad-core intel xenon, 9 gb ram, with BM Intensity Pro card

