Creative Communities of the World Forums

The peer to peer support community for media production professionals.

Activity Forums VEGAS Pro Is there a way to fast forward more than 4x?

  • Is there a way to fast forward more than 4x?

    Posted by Kevin Kim on July 26, 2009 at 3:47 am

    I usually use ctrl + drag to fast forward my clips, but for my current project I need to do some time lapses, so I need to fast forward an extreme amount. Is there any way to do this without rendering the clip and importing it back to shrink it and etc.?

    Tom Riz replied 16 years, 2 months ago 4 Members · 11 Replies
  • 11 Replies
  • Mike Kujbida

    July 26, 2009 at 4:34 am

    If you’re using Vegas Pro, add a velocity envelope for 3X the speed for a total of 12X. Render and repeat as necessary.

  • Kevin Kim

    July 26, 2009 at 4:41 am

    I think I need to go faster than 12x. But if that’s the only way (losing quality and time) then it’ll have to do.

  • Mike Kujbida

    July 26, 2009 at 5:09 am

    If you’re using DV-AVI footage, the encoder in Vegas is very good so you won’t lose much quality.
    There is another way that I forgot about and that’s to use a nested veg.
    If there’s more than one clip on the timeline, copy if to a new instance of Vegas and get the 12X increase done.
    Save this as a project (eg. speed-1.veg), close and start a new instance again, import speed-1.veg, repeat the 12X method and save this one as speed-2.veg.
    Save and repeat again as needed.
    Because you’re using a veg file instead of rendering, there will be no quality hit at all.
    Good luck with the project.

  • Kevin Kim

    July 26, 2009 at 7:23 am

    This works perfectly. Thank you very much! I also found that disabling resample on fast forwarded clips (right click/properties) cut down a huge amount of rendering time (more than 70%). Just sharing as it might help someone else.

  • Tom Riz

    April 27, 2010 at 3:39 pm

    Hi, I am a vegas pro 9 noob… I am having some problems with replicating what you have stated in this forum, specifically the envelop/velocity process…

    Source file is 12 minutes, I want to speed it up to 1 minute..When I cntrl-lick on stretch all the way to the left, I get a 3 minute file or so… I then add a velocity envelope, thrust it up words to 300% and the file is still 3 minutes, I get no difference when using velocity

    If you could, lay out a step by step process for a noob explaining how to make a 12 minute file, 1 minute it would greatly be appreciated!

    thx,
    riz

  • Mike Kujbida

    April 27, 2010 at 3:53 pm

    riz, after adding the Velocity envelope at 300%, the event is now in loop mode 3X.
    You need to drag it backwards until you find the end of the first loop point.
    This is shown as a small dip (looks like a V) at the top of the track.
    It’s very hard to see when you have a Velocity envelop line cluttering things up but it is there and you should see it “snap” as it hits that point.
    4X + 3X = 12X so your 12 min. video is no 1 minute.

  • Tom Riz

    April 27, 2010 at 11:12 pm

    Hi Mike, thank you for your response but man, I am pulling my hair out on this one! lol… ok, here is exactly what I am doing (wrong) and please tell me where I am just.not.getting.it!

    1)import 12min mp4 file and add to timeline
    2)one in timeline, right-click in blank part of timeline and select velocity envelope
    3)now added to time is a green line in middle, drag upwards to where it reads “velocity at 12min is 300%”
    4)goto right side of clip, control-left click until a box, with dual arrows and a squiggly line underneath it appears and drag as far left as it will go (which only goes to 3minutes and stops!)
    5)render clip and it is 3minutes long 🙁

    So, what am I missing lol!

    thank you!
    riz

  • Mike Kujbida

    April 28, 2010 at 1:57 am

    riz, what you’re missing is what I’ll call step 3A.
    Before you Ctrl+Drag, do the “shorten the clip to it’s new length” procedure I mentioned above.
    Once you do this, everything will fall into place.

  • Tom Riz

    April 30, 2010 at 3:42 pm

    Mike, thank you so much, finally ‘get it’ 🙂 My next q if you would indulge me, would to explain in greater detail how to take a 120 minute shot and make it 1 minute as well. You explained the usage of a nested veg but I don’t quite understand the process…

    So, i take my 120minute file and speed it up 12x… which mean its a 10 minute file now… If i re encode (i am encoding 1080pwmv files at 10mb bit rate) that file I imagine it will just be twice as lossy but you mentioned a way to not lose any more quality?

    Anyways, that is what I want to do, you detailed explanation is totally appreciated 🙂
    riz

  • Adam Rose esq.

    April 30, 2010 at 7:19 pm

    drop the veg file of the 12x sped up project on to the timeline of a new project and apply a further 12 x increase etc etc

    🙂

Page 1 of 2

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy