-
How long of a Premiere Sequence is TOO LONG?
Hello friends,
I have about 4.75 hours of content to edit, which will be put on three DVDs.
My problem is, I’m not sure yet where the footage will be split yet for the DVDs (we won’t know until we see the timestamps on each section, because each will need its own intro / conclusion filmed, and those will depend on what fits on each disc, etc).
Anyway, is it okay for me to end up with this 4.75 hours all on one sequence? It’s a two-cam set, so it’s about 400GB worth of footage, multi-media, etc.
I’m assuming I’ll just be able to copy-and-paste the other two thirds into their own sequences when I’m finished with the whole thing.
Does anyone see a reason why I shouldn’t do this?
Thank you!
Pat