-
FCP upgrade from 2.2 to 4.5
I recently inherited the edit of a long-term documentary project that began in FCP 2.2, OS 9 and was never upgraded.
We decided to upgrade to 4.5 and Panther since I’d upgraded smaller projects the same way without problem. Now the 11MB project file takes about 5 minutes to open. Other than that, everything appears to be fine. Does anyone have experience with upgrades of this sort from FCP 2.2 to 4.5?
Of course we’ve archived a version in 2.2 and could always go back. However, editing in 2.2 is a chore and if the upgrade works it will save us time and trouble in the end. I’m just hoping that the time it takes to open the project isn’t indicative of something larger. We’re using a G4 with 867MHz processor and 1.12 GB of SDRAM.
Thanks so much for sharing any experiences w/this!