-
Do Multiple EDL’s mean Multiple recaptures?
Hey
i Asked earlier about how to get a job from an older NLE to FCP, which i think i have figured out.
But Now i need to know this: i have several EDLS from timelines in my other job, and i want to import them, If i use CMX they seem to imposrt OK However each time I import an EDL it makes a folder of Master Clips (as it should). When FCP goes to recapture, will capture each master clip as a complete and separate file? or is it “smart” enough to capture a shot once, then point to it from the clips so that i dont have 5 copies of my inerviews on my system?
I ask this because as with all “versioned” type projects, there are common elements that would be redundant to have
i think the answer is the former, but i could be wrong. its happened before
bee eph