-
Correct method for joining clips?
What is the correct method for joining two clips in the timeline? (I know where the command is. Just not the best way to use it)
I thought it would be to select two clips at the same time then EDIT/JOIN CLIP. But that didn’t work.
I then picked one clip and and hit “join clip” and it worked… and it applied the correct grade to the other clip – which was nice… but I basically just got lucky with that.
What is the correct procedure for joining clips? I couldn’t find it in the manual.
Also is it possible to join a number of clips all at once?
Thanks