-
converting a subclip from 29.97 to 23.976
I’m new to AVID and am working on a low budget feature film shot on an Arri Alexa at 23.976. I’m the director but was forced to essentially assistant edit (I am a recent convert from FCP and had to take a crash course in MC6, i.e. Lynda.com). This was, of course, a terrible idea born out of necessity. We are in MC6 and I “AMA” linked to the ProRes footage and it worked like a charm. Due to my naivete I accidentally did a sync (audio to video) creating subclips in a 29.97 project. I meant to do this in a 23.976 project. So, when I want to play back the subclips in 23.976 (we created a new 23.976 project and copied everything in 29.97 project over) there is a jitter effect to the video which is when I discovered my mistake. My big question is, can I convert those 29.97 subclips to 23.976 in a quick and easy fashion? If so, how. If not, does that mean that I need to manually matchframe each subclip and then re-sync (will they get thrown off?) all of that footage? It took me three weeks to sync and log the first time around (no time code sync during production) so I’m already suffering from PTSD.
Can anyone offer an alternative solution to re-syncing everything manually so that my subclips become 23.976?
Thanks!
Henry “the naive one”