Creative Communities of the World Forums

The peer to peer support community for media production professionals.

Activity Forums Adobe After Effects Expressions control path length using expressions

  • Alex Printz

    September 6, 2019 at 8:49 pm

    I have built a trim paths expression to do this in the past.

    IIRC, you need to make a slider to set the ‘full’ length, then create a loop that measures the distances between pointOnPaths on a spline and adds them together, compares that to the ‘full’ length, and if the current spline is measured longer than that trim that percentage. I used a 2nd slider to set the number of points to compare (I think I liked around 12 or so, not too many to bog the system, not too few to look choppy)

    It worked well for what I needed to do (swinging rope I think?)

    Alex Printz
    Mograph Designer

Page 2 of 2

We use anonymous cookies to give you the best experience we can.
Our Privacy policy | GDPR Policy