-
Conforming 23.98 sequence to 29.97
Hi there,
I am assisting an edit that has the following problem:
This is a 5-minute long episode. Most of the footage was shot on 23.89fps. Some was shot on 29.97. The project was edited on Premiere on a 23.98 timeline. Everything has been converted to Apple ProRes so no incompatibility there. The client wants this project to to be converted to 29.97 progressive (NOT interlaced). What’s the best way to approach this? I read a ton of threads am pretty confused at this point. My plan was to:
1) Convert all the 23.98 footage to 29.97 using either Compressor or Twixtor. Which one is better? I read Shane Ross’ tutorial on using Compressor to accomplish this but it’s for interlaced video, not progressive.
2) Create a new sequence that’s set to 29.97.
3) Copy paste the 23.98 timeline into the sequence.
4) Replace all clips with the newly conformed fps clips.
Do you think this will work?
Does anyone have any recommendations? Should I be purchasing Twixtor or is there a way to do this without that plugin? Any help is truly appreciated.