-
Calculating 30 DF run time run time on 23.98 footage
Hello all,
I’m guinea pigging editing a show in Premiere for a large US cable channel with an entirely Avid based workflow. Everything is going well, but the only snag I’ve hit is that the network’s runtime standards need to be calculated at 30 drop frame, even though we are working at 23.98. In Avid, there is a simple dropdown menu for this, but Premiere does not seem to have this feature. I believe I’ve figured out a roundabout workaround, which I will describe below, but has anyone else encountered this issue and have a simple solution?
What I’ve done thus far is take my 23.98 timeline and drag it onto a 30 drop frame timeline to see my run time. With this method, 00:23:58:14 of 23.98 media comes out to 00:24:00:00 in 30 drop frame. This seems to fall in line with what I’ve seem in Avid. I’ve also tried running 30 drop frame timecode on an adjustment layer on the 23.98 sequence, however the math just does not seem to make sense and I can’t quite figure out why.