Hello,
i recently joined a time-laps project wich has some issues that make it really tedious, so I am trying to work around them and I am really desperate. Is there any way except batch-changing the name of the files to a sequenced number and reimporting all of them or for changing the folder structure or the software used?
Here is the story:
There are two cameras taking pictures approximately every 70 seconds. The naming convention is basically ID_YYYYMMDD_HHMMSS in a folder representing it’s camera and date on a server. This process is automated.Now they where imported into a Bin per day and camera which takes about 7 Minutes for each one, because they weren’t imported as a single footage due to the naming convention. Also the length for imported images was set to one second i.e. 25 frames.
For each Bin there is a sequence of roughly 1200 Images at 25 frames each. The next step was to create a mixdown of each sequence so you have one clip for each day.
This clip was put into a sequence with a time warp of 4000.0 to make it a shorter clip. This follows another mixdown to get a version you can put into the final cut.
I know there is a lot wrong with this whole pipeline. A lot of days already have been processed, a lot more are still to come. My knowledge of Avid is limited compared to other products. What I found out so far, correct me if I am wrong:
- There is no way to tell avid: create a single clip from those 1200 images in each Bin
- There is no way to collapse these Image sequences (with more than 25 clips) and or put them together in a nested sequence similar to Vegas/Premiere/After Effects/Final Cut without getting a second sequence of 1200 images. Right?
- There is no way to create a mixdown queue, either trough the menue nor the console. And there is no way to write a script. Might I have missed something there?
Sorry for the long read. Thank you in advanced.