-
23.98 footage workflow to 29.97 delivery for broadcast
Hi all,
Just double-checking the preferred workflow for delivering a show for broadcast in 29.97, where footage is all 23.98. I know FCP X has the four different 3:2 pulldown options (floor, nearest integer, frame blending, and optical flow). I did a bunch of tests and found that floor was decent, but optical flow was ideal visually despite the extra rendering required.
My question is, would you edit the footage natively in 23.98 and then output to 29.97 when outputting the master? Or would you edit within a 29.97 sequence (er, project) and perform the pulldown within that sequence on each individual clip?
My first instinct is to do the latter, simply for timing reasons. For a show that needs to be an exact length, to the frame, it seems editing in the delivery frame-rate would give me the most precise timing. I worry about getting a show to a precise length in a 23.98 sequence only to apply a pulldown on export and have a different end time for the program.
Thanks for all your thoughts.
Mac Pro 3 GHz 8-Core Intel Xeon E5, 32 GB Ram, AMD FireProD700
OSX 10.10.5, FCP 10.2.1