-
Project that contains 24p clips and 30p clips
So I’m making a short movie (fictional) about a crew of people who are trying to make a movie. I wanted to combine clips from the actual movie they are making – which would be 24p – and then the mockumentary part of it – which would be 30p – into one cohesive final project. I know enough about FCP that I can only output at one framerate, and that any 24p clips placed in my timeline would end up being converted to 30p (or the other way around).
Is there either a way to work around this, or make it so the 24p clips wouldn’t be harshly degraded when they’re converted, or do I have to bite the bullet and just pick a framerate?