too much footage?
I am about to quote on a very unusual job and I need to calculate how long this will take.
The client has security camera vision from 3 cameras supplied as .asf files. From EACH camera, there is 168 hours of footage!
I need to speed these clips up to make them only 5-10 min long and drop them onto the timeline to show all three cameras on screen (3 x PIPs) at once. Easy right?The video content TOTAL is 86 gig, so space shouldn’t be an issue. (I have 420 gig free)
I tested 5 min of footage, timed how long it took to upload, render, output etc. By my calculations I should be able to get this whole job done in about 6-7 hrs.
My concern is, am I going to run into other problems given the sheer length of these clips or the size of the files? eg. Will Final Cut need a few extra hours of thinking time every time I click on an icon?
I am working on FCP 6.0.6
Thanks in advance!
S Bedford, Western Australia