-
Using Media Manager to trim a project for a faster uprezz… cant make it work!
Hello everyone,
I have a 15 minute edited timeline that i need to uprezz from DV to HDV 1080i. Since the master clips are mostly long interviews, i’d have to capture about 10 hours of master clips in total, which obviously doesnt make any sense.
Im trying to use the media manager to grab that sequence and make new offlined clips that are just whatever is used in the sequence plus 10 second handles, so i can capture shorter clips and save HD space and do this whole thing a lot faster.
I cant seem to figure this out. I’ve read this tutorial and it works smoothly – until i look at my new clips and notice the duration is still the same as before. Media Manager even reported that the new media wouldnt be much more than what the sequence length is.
I cant figure it out. It seems like a pretty simple operation though.
Any thoughts? It’d be greatly appreciated!