-
23.98 NDF to DF for broadcast
I’ve done lots of searching but haven’t been able to really find an answer to my question/problem.
I am editing an hour long show that needs to time out at 44:30 including 6×10 seconds of blacks for breaks.
I’m editing 720p23.98 material and am trying to figure out a way to set this up so it times out properly when down converting to Beta SX.
I am currently working in a 23.98 timeline and thought it may be easier to copy everything to a 59.94 timeline but when I copy a sequence over alot of the audio levels change, audio clips are out of sync with their respective video tracks and there are gaps between clips.
Am I missing something here? Is there an easier way to do this?
I’ve read about the timecode calculator, using slugs to make it time out properly but I still can’t wrap my head around it.
