-
Rebuild Feature Length Timeline -Yikes!
Hello,
Thanks to everyone who helped with my previous question.
So now that the video/audio are synced on my project, I need to reconstruct the entire timeline (about 1000 edits.)
Summary: I have a former, edited project w/(bad)camera audio in one project folder, but the clips with good audio synced up in a different project folder.
I’ve read some previous posts but just would like to clarify: what is the fastest way to reconstruct my entire timeline in the folder that has synced audio clips?
Thank you!!
P.S. I can’t recapture, and I think using timecode may be impossible or too confusing.